Howto Config Load profiel on AV/2900
A delay phase at the beginning of a test is often used for allowing the NIC cards to negotiate the links gracefully.
A ramp up phase quickly and proportionally raises the load to the starting level of a capacity assessment test.
A stair stepping phase incrementally adds load to determine the breaking point of the device under test.
A steady phase stress tests the device under test.
The ramp down phase delays conclusion of the test until all of the work-in-progress has completed.
Friday, August 1, 2008
Labels:
Performance Test
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment